爆破与开挖瞬态卸荷双重动力扰动下岩溶隧道掌子面突水灾变机理研究
项目来源
项目主持人
项目受资助机构
项目编号
立项年度
立项时间
研究期限
项目级别
受资助金额
学科
学科代码
基金类别
关键词
参与者
参与机构
项目受资助省
项目结题报告(全文)
1.曲线段双护盾TBM隧道上穿既有隧道变形规律分析
- 关键词:
- 隧道工程;曲线段隧道;双护盾TBM;既有隧道变形;管片偏移;TBM撑靴;理论解析
- 檀俊坤;殷爱国;乔世范;刘建伟;李二伟;翟乾智
- 2025年
- 卷
- 期
- 期刊
新建隧道穿既有隧道的直线段单护盾盾构施工对既有隧道环境影响已有许多研究,针对曲线段双护盾TBM隧道施工效应的研究还较少。首先,开展曲线段双护盾TBM隧道上穿既有隧道变形规律监测试验,表明:双护盾TBM穿越既有隧道施工时,撑靴作用对邻近既有隧道具有一定重要影响;曲线段管片受盾位推力向外产生水平偏移,其偏移对围岩作用影响范围约距盾位向后10m内,偏移作用随与盾尾距离增大而增大。其次,分析了曲线段管片偏移与围岩相互作用,并基于Mindlin解构建了考虑卸荷应力、刀盘推力、盾壳摩擦力、撑靴支撑力、曲线段管片偏移作用及撑靴摩擦力共同作用的附加应力计算模型,基于Winkler地基模型推导了双护盾TBM新建隧道上穿既有隧道变形解析公式,并通过实例监测、有限元数值模拟的方法对解析公式进行验证及分析。此外,针对曲线段管片偏移作用、新建隧道与既有隧道净距、新建隧道推进距离等关键参数进行了既有隧道变形的影响分析。参数分析表明:直线段既有隧道的隆起变形位移关于新建隧道轴线对称,曲线段双护盾TBM隧道开挖对既有线影响区在距既有隧道轴线-1m到15m的范围内,隧道隆起变形随推进距离的增加表现为先增大后减小的规律,...
...2.Study on the Combined Mining Scheme for Coal Resources under High-Voltage Pylons and the Reinforcement for Pylons
- 关键词:
- high-voltage pylons; combined mining scheme; foundation strengthening;numerical simulation and field monitoring;SURFACE SUBSIDENCE; PILLAR; DEFORMATION; SIMULATION; STABILITY; DESIGN
- Liu, Hongyang;Du, Mingrui;Zhang, Boyang;Lin, Zhibin;Liu, Chengwei;Wang, Feng
- 《ENERGIES》
- 2022年
- 15卷
- 11期
- 期刊
The increasing use of high-voltage transmission wires requires more and more high-voltage pylons, and sometimes, constructing pylons in mining areas is very urgent. To ensure the safe operation of pylons, coal pillars with large side lengths are usually used to provide sufficient support; however, this results in a huge waste of coal. Eight high-voltage pylons are arranged on the ground surface corresponding to the location of working face 1110 of Sima Coal Mine in Shanxi Province, China, which cannot be mined by traditional methods. Taking this as the engineering background, the failure mode of high-voltage pylon is first analyzed. Using FLAC(3D) numerical simulations, the influence of five different mining plans on ground surface deformation in working face 1110 is evaluated, and the vertical settlement and horizontal deformation in different areas of the ground surface, as well as the variation law of horizontal strain and slope are analyzed. According to the numerical simulation results, the range of thickness-limiting mining or backfill mining in working face 1110 is shown in scheme 3, and the key regions in the mining process are determined. Secondly, the strengthening scheme of high-voltage pylons is designed, that is, the four foundations of high-voltage pylons are connected as a whole with steel supports and steel connectors so as to improve the structural strength of the high-voltage pylon. Finally, the position change in the foundation of high-voltage pylons was monitored for 22 consecutive months. The results show that the maximum settlement of the high-voltage tower foundation is 3.1 m, which is consistent with the actual mining thickness; The high-voltage pylon was stably moved, and the change in transmission line tension and total length was usually less than 1.0%. The combined mining scheme and foundation strengthening scheme can ensure the safe operation of high-voltage pylons and provide a new method for the stability control of ground buildings in coal mining subsidence area.
...3.护盾式TBM隧道施工管片竖向偏移解析与应用
- 关键词:
- 隧道工程;管片竖向偏移;弹性地基梁;护盾式TBM;下部注浆;回填厚度;填充率
- 檀俊坤;殷爱国;乔世范;翟乾智;李二伟;张远松;武进广
- 2024年
- 卷
- 期
- 期刊
护盾式TBM隧道管片偏移是隧道建设的难题之一。以护盾式TBM隧道回填、注浆施工阶段引起管片竖向偏移为研究背景,首先,分析了护盾式TBM施工特点和管片竖向偏移机理,基于温克尔弹性地基梁假定和分层综合法,建立了护盾式TBM碎石-围岩耦合基床系数,并推导了临时支护阶段隧道管片沉降计算公式;然后,分析了注浆引起的管片上浮机理,并将止浆环简化为隧道管片固支点,基于弹性地基梁理论建立了隧道管片上浮分析模型,推导注浆引起的隧道上浮计算公式;最后,结合临时支护阶段管片沉降解,获取管片竖向偏移总量,并对管片沉降与上浮阶段进行关键参数敏感性进行分析。研究结果表明:隧道管片竖向偏移理论计算结果与实测值能够较好吻合,可有效揭示管片沉降及上浮变形规律,以及管片上浮引起的管片弯矩、剪力变化特征;沉降阶段,管片沉降量与压缩模量、管片环向半径成正增长,与回填层厚度呈负增长;上浮阶段,浆液充填率、地层弹性系数、回填厚度对护盾式TBM隧道管片上浮比较敏感,回填层厚度大、回填密实度小、下部注浆充填量过大、过小等易导致管片竖向偏移大。
...4.Laboratory investigation of the spatial thermodynamic properties of the bridge approach in the permafrost region
- 关键词:
- bridge approach; permafrost region; gravel sandwich; temperature field;subgrade;TRANSITION SECTION; TRACK
- Yin, Qixiang;Wu, Junjie;Zhang, Boyang;Hou, Mingjiao
- 《FRONTIERS IN EARTH SCIENCE》
- 2024年
- 12卷
- 期
- 期刊
As the highest altitude and the longest plateau railway line, the Qinghai-Tibet railway passes through a large area of continuous permafrost. As the key position of the combination of roadbed and bridge, the stability and strength of the bridge approach directly affect the smoothness of the whole line. Through an indoor model test, the distribution pattern of space temperature field and the change law of temperature measuring points in the bridge approach of gravel sandwich are studied. With the increase in the depth from the subgrade surface, the influence of the temperature change in the upper atmosphere decreases gradually at the 2.5-m platform back of the subgrade center section, resulting in an obvious lag in the subgrade. By comparing the temperature measurement data of different bridge approaches of the gravel interlayer road bridge and the bridge approach of the U-shaped block gravel road bridge, it is shown that the U-shaped structure not only has a better overall cooling effect, but also the cooling effect gradually increases with the increase in the distance from the abutment back. The influence range of the road-bridge transition section on the spatial temperature field is approximately 14 m in the back of the abutment, and the influence range at 7.5 m is the most severe. The research results have important practical significance and engineering application value for the operation and maintenance of the Qinghai-Tibet railway.
...5.Design and field evaluation of hydraulic fracturing boreholes for terminal mining faces.
- Zhang, Boyang;Song, Weiya;Wang, Yiming;Li, Zhenhua;Huang, Huwei;Lin, Zhibin;Yao, Banghua
- 《Scientific reports》
- 2024年
- 14卷
- 1期
- 期刊
The terminal mining is an essential part of fully mechanized mining, and the reasonable length of the flap roof during the terminal mining is an important basis for the smooth operation of the terminal mining. With the research background of the 213 working face of the Longde Coal Mine, the contribution of this study is the influence law of hydraulic fracturing on the terminal mining mechanical behavior of the working face. Four different numerical calculation models of terminal mining hydraulic fracturing are established, and the optimal hydraulic fracturing site plan is determined according to the length of the terminal mining flap top and the working resistance of hydraulic support. The effect of hydraulic fracturing construction and the law of mechanical behavior in the terminal mining stage in the field test are analyzed. The results show that through hydraulic fracturing technology, the control of the length of the flap roof of the working face during the terminal mining period has been realized. © 2024. The Author(s).
...6.Experimental study on the seepage mutation of natural karst collapse pillar (KCP) fillings over mass outflow
- 关键词:
- KCP-related water inrush; KCP filling; Seepage mutation; Fluid path;Porosity;PERMEABILITY; FLOW; COAL; BEHAVIOR; COLUMN; ROCK
- Zhang, Boyang;Liu, Gang;Li, Yingchun;Lin, Zhibin
- 《ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH》
- 2023年
- 30卷
- 51期
- 期刊
Conduction between the unique geological formation karst collapse pillar (KCP) and the fractures caused by mining in the coal seam floor can lead to catastrophic water inrush disasters in many coalmines in Northern China. It is widely recognized that seepage mutation induced by the migration/loss of KCP fillings (highly broken rocks filling the fractured rocks) happens during occurrence of the KCP-related water inrush. However, roles of fluid path (mining-induced fracture) scale and KCP filling porosity in seepage mutation evolution remain unclear. Here, we conducted seepage tests on natural KCP fillings containing rock particles of different sizes. The filling specimens were deformed to different porosities from 14 to 26% through axial compression, and small to large fluid paths were simulated by seepage plates with distinct pore sizes from 2.5 to 12.5 mm. We found that seepage mutation occurs with significant permeability enhancement by 2 orders of magnitude under a pore diameter of 12.5 mm and a specimen porosity of 26%. There is a strong linear relationship between specimen permeability and Reynolds number (Re) over seepage mutation. The mutation is caused by the sudden collapse of the specimen skeleton and subsequent quick outflow of the particles. Therefore, it is inferred that the KCP-related water inrush is more likely to happen when highly porous KCP fillings are present and mining-induced fractures are well developed.
...7.Experimental Study on Similar Materials for Fluid–Solid Coupling for Model Test of Water Inrush in Karst Tunnel
- 关键词:
- Calcium carbonate;Landforms;Mixing;Sensitivity analysis;Silicones;Fluid-solid coupling;Influential factors;Karst tunnel;Mixing proportion test;Mixing proportions;Model tests;Multiple linear regressions;Orthogonal test;Similar material;Water inrush
- Wu, Wenlong;Guo, Jiaqi;Liu, Xiliang;Zhu, Zhengguo;Wang, Erbo
- 《Geotechnical and Geological Engineering》
- 2023年
- 41卷
- 7期
- 期刊
In this work, the authors study the mixing proportions of similar materials for use in tests of models of fluid–solid coupling by using the orthogonal test on six factors at five levels. We used river sand and calcium carbonate as aggregates, white cement and chlorinated paraffin as cementing agents, and iron sand and silicone oil as regulators. The physical and mechanical parameters as well as the hydro-physical properties of similar materials were tested at different mixing proportions, and the sensitivity of the results to the influential factors was assessed by range and variance analysis. A linear regression-based analysis of 25 groups of results was then carried out on STATA software. Following this, the similar materials chosen for fluid–solid coupling based on the above tests were applied to the model test of water inrush in a karst tunnel. The results showed that the fluid–solid coupling similar materials of karst strata were prepared, the main factors influencing basic parameters variation of similar materials were obtained; a quantitative relationship between the influential factors and parameters of the materials was also constructed, and can be used to significantly improve the efficiency of testing; the similar materials developed here can satisfy the requirements of tests on models of fluid–solid coupling. This study has important reference value for research on similar materials for fluid–solid coupling in tests of models of karst tunnels. © 2023, The Author(s), under exclusive licence to Springer Nature Switzerland AG.
...8.岩溶隧道断续裂隙掘进面突水过程三维离散元分析
- 关键词:
- 岩溶隧道;断续裂隙;突水;裂隙倾角;三维离散元
- 郭佳奇;王二博;赖永标;杨卫领
- 《河南理工大学学报》
- 2023年
- 卷
- 期
- 期刊
为探究岩溶隧道在开挖过程中处于不同倾角断续裂隙下防突结构位移、渗流场和岩溶水压的变化规律,运用三维离散元软件进行数值模拟分析研究。构建岩溶隧道断续裂隙掘进面突水计算模型,模拟分析了隧道发生突水灾害时,防突岩体的多元物理信息变化过程。结果表明:隧道掘进面的最大位移点通常位于裂隙和隧道掘进面的交界处;当裂隙倾角从20°增至45°时,水压不断增大;倾角从45°增至70°时,各位置处的水压逐渐减小;随着岩溶裂隙倾角不断增大,岩溶水在裂隙中的最大流速先减小后增加。研究结果可为岩溶隧道突水防控提供指导作用。
...9.聚丙烯纤维混凝土衬砌堤坝应用数值模拟
- 关键词:
- 聚丙烯纤维 混凝土衬砌 有限元分析 ADINA 数值模拟 堤坝 基金资助:国家自然科学基金项目(51778215); 河南省科技攻关项目(172102310742,172102310253); 专辑:农业科技 专题:农业工程 分类号:S277 手机阅读
- 郑慧慧
- 0年
- 卷
- 期
- 期刊
素混凝土衬砌破坏一直是灌区建筑物健康发展的难题,由于素混凝土衬砌断面厚度较大、造价较高、衬砌自身刚性与背后堤坡之间存在较大间隙,在外界荷载的作用下常常发生破坏,从而严重威胁到灌区堤坝工程的安全运行。从堤坝衬砌破坏机理出发,针对破坏的位置以及破坏现象提出一种新型材料(聚丙烯纤维混凝土)堤坝衬砌形式,并利用通用有限元软件ADINA对素混凝土衬砌与聚丙烯纤维混凝土衬砌堤坝进行了数值模拟分析,结果表明:聚丙烯纤维混凝土衬砌同素混凝土衬砌堤坝相比应变基本相同,但其韧性与抗剪性能显著特高,是一种科学实际的衬砌方法。
...10.基于雅申理论地下连续墙与岩溶侧壁稳定性分析
- 关键词:
- 基坑工程 局部线性化 安全厚度 溶洞侧壁 抗拉强度 基金资助:国家自然科学基金资助项目(51778215); 中铁建投重点研发项目(20192001); 专辑:工程科技Ⅱ辑 专题:公路与水路运输 分类号:U451.2U455 手机阅读
- 檀俊坤;乔世范;蔡子勇;赵勇;张细宝;向南
- 0年
- 卷
- 期
- 期刊
为解决岩溶区混凝土灌注阶段地下连续墙与溶洞间岩层稳定性问题,对现浇混凝土地下连续墙受力形式进行分析,基于雅申理论建立现浇混凝土非线性侧向压力计算理论模型,推导现浇混凝土侧向压力计算公式,并对侧向压力影响因素进行简单分析;在现浇混凝土非线性侧向压力计算公式基础上,进行溶洞侧壁荷载局部线性化处理,提出局部线性计算安全系数的确定方法,获得现浇地下连续墙侧部岩溶最大弯矩及溶洞侧壁最小安全厚度的计算方法,依此进行地下连续墙溶洞侧壁稳定性分析;通过典型工程数据进行影响因素的分析,揭示岩溶侧壁最小安全厚度随溶洞形态的竖向跨度、岩石抗拉强度、埋深、混凝土坍落度及浇筑时长的变化规律,确定地下连续墙侧部岩溶稳定性分析的基本原则;研究结果表明:溶洞侧壁最小安全厚度随埋深、跨度及混凝土坍落度增大而增大,随岩石抗拉强度及浇筑时长增大而减小,工程设计与稳定性评价时应基于勘测及施工数据分析岩层稳定性,以便于评价结果与实际情况更为贴切。
...