膨胀土岸坡和堤坝渗透滑动检测识别与评估

项目来源

国(略)研(略)((略)D(略)

项目主持人

王(略)

项目受资助机构

长(略)规(略)研(略)责(略)

项目编号

2(略)Y(略)5(略)0(略)

立项年度

2(略)

立项时间

未(略)

研究期限

未(略) (略)

项目级别

国(略)

受资助金额

4(略)0(略)

学科

重(略)灾(略)预(略)范

学科代码

未(略)

基金类别

“重(略)灾(略)预(略)范”重点专项

关键词

膨(略);(略)推(略) (略)法(略);(略)勘(略) (略)动(略)估(略);(略)a(略)v(略)o(略);(略)m(略)a(略) (略)e(略)o(略) (略)c(略)c(略)p(略)p(略)i(略);(略)i(略)c(略)s(略)a(略)n(略)d(略)s(略) (略)e(略)e(略)m(略)o(略)o(略)a(略) (略)i(略)a(略)n(略)i(略)g

参与者

张(略)涛(略)燊

参与机构

未(略)

项目标书摘要:本课(略)实施方案稳步推进,(略)中期研究任务。按照(略)土岸坡和堤坝渗透滑(略)作进展包括:完成了(略)移地震观测系统设计(略),其中“堤坝电阻率(略)国家发明专利授权;(略)震数据反演方法研究(略)合正则化约束反演方(略)相关时移地震数据分(略)坝隐患地球物理电性(略)模拟,确立了水体渗(略)球物理电性和弹性参(略)方法研究提供了理论(略)宋岗码头开展了膨胀(略)和时移地震检测野外(略)测观测系统、二次时(略)移数据反演方法,基(略)和时移地震检测有效(略)、测道数等观测系统(略);初步完成岸坡和堤(略)系统设计方案及关键(略)一套完整的时移电法(略)并已完成主机选型与(略)坡全生命期行为评定(略)非线性动力学判据,(略)透滑动灾变临界判据(略)渗透滑动灾变评估方(略)

Applicati(略): The res(略)of this s(略)dvancing (略) strict a(略)ith the p(略)ementatio(略) the inte(略)h task re(略)he assign(略)as been b(略)mpleted. (略)o the res(略)rements, (略)h progres(略)ion ident(略)nd safety(略) of water(略)on slidin(略) xpansive(略)kment and(略) includes(略)the desig(略)apse elec(略)pecting a(略)se seismi(略)on system(略)ment and (略)and submi(略)plication(略)cal inven(略),“The res(略)mputerize(略)y system (略)pe”has be(略)ed by the(略)nvention (略) inversio(略)of time-l(略)ical pros(略) time-lap(略)observati(略)prelimina(略)ed. A hyb(略)ized cons(略)ersion me(略)me-lapse (略)prospecti(略)proposed,(略)alysis me(略)e-lapse v(略)relation (略)ng seismi(略)lso propo(略)ry out th(略)rd modeli(略)ysical el(略)d elastic(略)haracteri(略)nk slope (略)zards is (略), and set(略)racterist(略)hysical e(略)nd elasti(略)s of bank(略)dyke caus(略) permeati(略) provide (略) guidance(略)dy of tim(略)ection. F(略)ments of (略)electric (略)time-shif(略)etection (略)e soil ar(略)ried out (略) Wharf of(略)u Reservo(略) time-lap(略)n and obs(略)stem, col(略)secondary(略) observat(略)d time-sh(略)version m(略)verified.(略) design s(略)ey functi(略)s of time(略)trical pr(略)echnology(略)ent have (略)inarily c(略)nd a comp(略) design s(略)me-lapse (略)thod dete(略)ment has (略)ed, and t(略)ection an(略)stomizati(略)n complet(略) with the(略)dynamic c(略) the whol(略)od behavi(略)on index (略) analysis(略)expansive(略)slope, th(略)criterion(略) slip dis(略) on time (略)tion is e(略) and the (略)sessment (略)eepage sl(略)kment and(略) and dam (略)arily for(略)

项目受资助省

湖(略)

  • 排序方式:
  • 1
  • /
    (略)
  • 排序方式:
  • 1
  • /