Tünel kalıpla yapılan yapıların statik ve deprem analiz ve dizayn yöntemlerinin geliştirilmesi
项目来源
土(略)学(略)事(略)((略)I(略))
项目主持人
N(略) (略)A(略)
项目受资助机构
O(略) (略)u(略)k(略) (略)v(略)i(略)i(略)k(略),(略)k(略)
项目编号
İ(略)G(略)5
财政年度
1(略),(略)3
立项时间
未(略)
研究期限
未(略) (略)
项目级别
国(略)
受资助金额
1(略)6(略)4(略)
学科
İ(略)a(略)e(略)p(略)e(略)l(略)s(略)
学科代码
未(略)
基金类别
İ(略)G
关键词
未(略)
参与者
Ç(略)N(略)L(略);(略)ı(略)e(略) (略)O(略);(略)i(略)I(略)I(略)Ğ(略)
参与机构
未(略)
项目标书摘要:Tu(略)onstructi(略)s conside(略) semi-ind(略)|construc(略).This tec(略) used in (略)ruction o(略)ucted con(略)urope aft(略)nd World (略)s the mos(略)way of pr(略)lter to t(略) in a fas(略)is system(略)erred to (略)nd 1970's(略) is a wid(略)stem espe(略)he constr(略)ultistore(略).The Turk(略)uilding s(略)n countri(略)ya and Ru(略)mmonly ma(略) the tunn(略)struction(略)structure(略)ed with t(略)system,th(略)e in the (略)t plate a(略)s are con(略) walls.Th(略)el form i(略)ll the fl(略) economic(略)is means (略)mensions (略) carrying(略) the same(略)tire heig(略)uilding,e(略)ent.The a(略)hods for (略)ear wall-(略)ms are be(略)d upon si(略)These met(略)are now g(略)ll accept(略)sufficien(略)alysis of(略) to be bu(略)e tunnel (略)uction sy(略)st import(略) for this(略)cts that (略)alls in t(略)es built (略)nnel syst(略) taller(1(略) those of(略)cal syste(略)the rigid(略)floor pla(略) than tha(略)ear walls(略)eved that(略)ction bet(略)ear walls(略)oor plate(略)ifferent (略)teraction(略)e shear w(略)e frame o(略)ical syst(略) reason,t(略) general (略)puter pro(略),TABS80,T(略)nd the ge(略)d hand ca(略)echniques(略)e dependa(略).In this (略)e analysi(略)walled st(略)ilt with (略)form cons(略)stem subj(略)teral loa(略)ting stat(略)nt earthq(略)nd loads (略)ng specia(略)ements.Th(略)ctures of(略)pes to be(略)he firms (略)this proj(略)d using t(略) and the (略).The sour(略)repancy a(略)ed.
- (略)